IPCC Expert Group Scoping Meeting Report(2003):Revision of the “Revised 1996 IPCC Guidelines for National Greenhouse Gas Inventories.45p.


TABLE OF CONTENTS

1 BACKGROUND, OBJECTIVES AND ORGANISATION OF THE MEETING.................. 4
2 PLENARY AND BOG SESSIONS ......................................................................................... 4
 2.1 FIRST PLENARY............................................................................................................... 4
 2.2 BOG SESSIONS................................................................................................................ 7
  2.2.1 Cross-cutting issues.................................................................................................. 7
  2.2.2 Energy....................................................................................................................... 7
  2.2.3 Industrial Processes and Solvent and Other Product Use ....................................... 8
  2.2.4 Agriculture and LULUCF ........................................................................................ 9
  2.2.5 Waste ...................................................................................................................... 10
  2.2.6 Emerging issues and consolidation of the BOG outputs ........................................ 10
 2.3 FINAL PLENARY AND OUTPUTS OF THE MEETING............................................. 10

ATTACHMENT 1: DRAFT TOR, TOC and WP (as agreed by TFB11) .............................. 12
ATTACHMENT 2: CROSS-CUTTING ISSUES . MINUTES OF THE BOG SESSIONS AND DETAILED DRAFT TOC............................................................................................ 18
ATTACHMENT 3: ENERGY . DRAFT DETAILED TOC, TOR AND OTHER INPUT .. 22
ATTACHMENT 4: INDUSTRIAL PROCESSES AND PRODUCT USE . SUMMARY OF ISSUES DISCUSSED AND DRAFT DETAILED TOR AND TOC..................................... 25
ATTACHMENT 5: AGRICULTURE, FORESTRY AND OTHER LAND USE (AFOLU) 29
ATTACHMENT 6: WASTE . ISSUES DISCUSSED AND DETAILED DRAFT TOR AND TOC........................................................................................................................................ 32

SUMMARY

The Scoping meeting developed the draft Terms of Reference (TOR), the Table of Contents (TOC) and work plan for the work on the revision of the Revised 1996 IPCC Guidelines for National Greenhouse Gas Inventories. The drafts were forwarded to the 11th Session of the Task Force Bureau of the IPCC National Greenhouse Gas Inventories Programme for finalisation before forwarding them to IPCC Panel (Vienna, Austria, 3 . 7 November 2003) for endorsement.

1 BACKGROUND, OBJECTIVES AND ORGANISATION OF THE MEETING

1. The Scoping Meeting on the “Revision of the Revised 1996 IPCC Guidelines for NationalGreenhouse Gas Inventories” was held in Geneva on 16-18 September 2003. The meeting was organised by the IPCC NGGIP. Its main objectives were:

2. The meeting was attended by sixty six experts (Participant list attached at the end of this report in Attachment 7) and its deliberations were conducted both in plenary sessions and in seven Breakout Groups (BOGs). The BOGs covered all sectors in the IPCC Guidelines (Energy, Industrial Processes and Solvent and Other Product Use (joint BOG), Agriculture and Land Use, land-use change and forestry (joint BOG), and Waste), cross-cutting issues and the so-called emerging issues. The Emerging Issues BOG focused on issues related to the integration of the existing materials, scope of gases and sources/sinks and other issues of relevance to the whole report. They consolidated the inputs from the other BOGs on draft TOR, TOC and Work Plan for the discussions and approval at the last plenary of the meeting.

3. The final outputs of the meeting were forwarded to the 11th Session of Task Force Bureau (TFB) for consideration and finalisation before forwarding them to IPCC Panel (Vienna, Austria, 3-7 November 2003) for endorsement. TFB11 met on 19 September 2003, back-to-back with this Scoping Meeting. The draft TOC, TOR and Work Plan, as agreed by the TFB 11, are attached to this report (see Attachment 1).


ホーム